Project Name:
400Amp Electrical Reticulation
Value:
$180,000
Deliverables:
Electrical - Power
Location:
Bellevue Hill NSW
Completed:
2020
Client:
The Scots College
Builder:
Rohrig Constructions P/L

Scope of Works:

We were successful and were awarded the works to carry out the installation of 400Amp Consumers Mains to the new John Cunningham Student Centre. A project which is due for completion 2022.

The brief involved designing a route path with the assistance of consultants and architects through existing buildings which did not really have existing infrastructure corridors to install such a large Electrical supply. We carried out the installation of a fire rated cable tray, core holes, path crossings excavation, installation of large scale pit and pipe infrastructure. The supply and installation of fire rated 185sqmm mains in parallel some 250m from a sub-station (kiosk) via a customised main switchboard and through risers, shoring cavities, voids and lift shafts.

The project was very successful and was finished to a very high standard of quality.

Some points to note:

  • All work was carried out in house with the only sub-contractor employed was an excavator driver