Project Name:
Cootes Theatre – Lighting Upgrade
Value:
$50,000
Deliverables:
Electrical, Theatre Lighting
Location:
Centenary Building, Bellevue Hill Campus
Completed:
2017
Client:
The Scots College

Scope of Works:

The refurbishment of an existing theatre involving the replacement of all seating, lighting, emergency lighting, event lighting and cabling services between the sound room and the stage. We carried out the full lighting design. We removed an existing small Philips Dynalite system, upgraded to Clipsal Cbus (to match in with other similar lecture rooms), upgraded all outlets, data points and switch plates, re-built and modified all tread lighting to LED, upgraded all exit and emergency lighting, installed an in-floor outlet box for purposes of the lectern. We also carried out audio visual prewiring as directed. Finally, we supplied and installed access control to all entry exit egress doors, installed CCTV in the theatre as well as outside in the theatre foyer.

Please wait...