Urban Electrical

THE SCOTS COLLEGE

Bellevue Hill

\

Project Name:
New Scoreboard Installation
Value:
$25,000
Deliverables:
Ground surveying/Pre-scanning, excavation, telecommunications infrastructure fibre pre-wiring, termination and testing as well as switchboard upgrade 
Location:
Various sites at Bellevue Hill Campus & Gladesville
Completed:
2018 – 2019
Client:
The Scots College

Scope of Works:

Service and maintenance to the complex including:
• Installation of new electronic scoreboard to sports oval
• Real-time camera feed
• Installation of fibre to location
• Upgrade switchboard
• Installation of data cabinet with FOBOT, ethernet switches and Cat 6 patch panel
• Excavation of 80m trench across oval
• Installation of pits and pipe work
• 12-core multimode loose tube fibre from scoreboard data cabinet to supply cabinet (location on 5th storey)
• Terminations and testing